What should you look for when buying?
First, decide how you want your NAS to respond to a power cut. Then compare the total load, the backup time you need and the space available with the specifications of each UPS model.
| What matters |
What to check when buying |
Who is it important to? |
| NAS communication and shutdown |
Check compatibility with your specific NAS model, the USB or network connection, and the configured response time. |
If I want to bring my NAS safely to a controlled state during a prolonged outage, I need a suitable notification method. Around 33% of consumers put NAS communication and orderly shutdown first. |
| Power and runtime |
Compare the total load in watts, the watt and VA limits, and the runtime quoted for a similar load. |
If you want your NAS and essential network equipment to keep running together, the available time at their combined load is what matters. Around 27% of consumers prioritise runtime for their connected devices. |
| Desk space and outlets |
Check the unit’s dimensions and the space needed for cables; find out which outlets are battery-backed. |
If I have limited space on my desk, the UPS and its cables need to fit without me overlooking any battery-backed outlets I need. Around 20% of consumers put space requirements first. |
| Output waveform |
Compare the requirements of your connected power supplies with the manufacturer’s stated waveform when running on battery. |
If my NAS power supply requires a particular output waveform, I need to check this before buying. Around 20% of consumers prioritise a waveform that suits their devices. |
Joybuy products
Related products coming soon.
Frequently asked questions
How do I set up shutdown for my NAS?
First, check whether your NAS model supports the UPS. In Synology DSM, you can enable UPS support under “Hardware & Power > UPS” and set the time before it switches to safe mode. For QTS/QuTS hero, QNAP describes connecting via USB or SNMP and configuring the settings under “External Device > UPS”. Then test in safe conditions to make sure the desired response occurs.
Is the VA rating enough to estimate runtime?
No, the VA rating alone isn’t enough. Work out the combined load of the devices you plan to connect in watts, check the UPS’s watt and VA limits, and compare the runtime figure for a suitable load with your shutdown sequence.
What should I know about replacing and disposing of the battery?
Before you buy, check whether a replacement battery is available for the specific model and whether you can replace it. The German Environment Agency recommends not putting used batteries in household waste, but taking them to suitable return or collection points.
Which marking is relevant for a mains-powered UPS in Germany?
The EU Low Voltage Directive applies to electrical equipment with rated voltages of 50 to 1,000 V AC. EUR-Lex explains the related CE marking and conformity requirements. Check the details for the specific EU or German version. A CE marking alone doesn’t confirm that the UPS is compatible with your NAS.